Concrete mixing station before work, we need to do its daily inspection work, then, what needs to check it?
First, check the rotation of the lubrication point of the work of the situation, timely supply of lubricants.
Second, check the lubricating oil within the lubricating oil pump, timely supply of lubricants.
Third, a week to check the gas system on the oil mist on the oil level, the use of viscosity of 2.5 ~ 70 E of the oil.
Fourth, open a drain valve every day, the air compressor and gas tank condensed water discharge.
Fifth, fasteners (such as bolts and nuts) to always check whether loose, found to be loose, you must tighten in time, especially some by the amplitude of the load components.
Six, often check the water supply, gas supply and admixture system of the equipment is normal.
7, check the electrical control system and the instrument is normal.
8, check the concrete mixing plant mixer shaft and the cylinder is clean and clean, if the mixing shaft condensation of concrete too much, must be manually into the clean-up.
Nine, regularly clean up or replace the powder tank filter in the filter.
10, if the shutdown time more than a week or more, you must empty the measurement of the bucket of materials (such as cement, water, admixture and a variety of aggregate), and cleaning the mixing host, hopper, etc., to avoid material compaction.
Note: clean the powder tank filter in the filter can not be washed, only with gas blowing or soft brush cleaning.