Tip: concrete mixing station after stop work

Quick inquiry
I am interested in, the capacity is . This equipment will be used in (area). My name is , my Email is , my phone number is . Please send me detailed quotation list!

Today, I will introduce the concrete mixing station after the shutdown notice:
1. After operation, the mixing cylinder, the discharge gate and the outlet hopper shall be cleaned and flushed with water, and the additive and supply system shall be flushed at the same time. The knife seat of weighing system shall be cleaned and the weighing accuracy should be ensured.


2, freezing season, should be put into the water pump, additive pump, water tank and additive box storage water, and should start the pump and additive pump, run one or two minutes.
3. When the mixing station is transferred or deactivated, the water tank, additive box, cement, sand, stone storage hopper and weighing hopper shall be cleaned and cleaned. Transfer, should balance weight lever meter is fixed, the sensor should be unloaded.